• Waste Water Management, IIT Mandi, Kamand Campus.

    Waste water treatment is a process to convert wastewater into an effluent that can be either returned to the water cycle with minimal environmental issues or reused. The later is called water reclamation and implies avoidance of disposal by use of treated wastewater effluent for various purposes. Treatment means removing impurities from water being treated and some methods of treatment are applicable to both water and wastewater.Waste water treatment plants may be distinguished by the type of wastewater to be treated, ie.whether it is sewage,industrial wastewater and agricultural wastewater. Wastewater quality indicators include the following tests: Biochemical Oxygen Demand, Chemical Oxygen Demand, Coliform Index, Dissolved Oxygen, Heavy Metals, pH, Salinity,Temperature, Total Dissolved Solids, Total suspended solids, Oil & Grease ,Turbidity, etc.

    Sewage Water from the Institute,mess,hostels,quarters and the entire campus flows through an inlet pipe into the large machine, the RMBR (Rotating Media Bioreactor), inside the STP, where oxidation takes place. The outlet of the RMBR connects to an outside tank ,where it is treated with alum and stored for what is called the Primary Treatment. When the sedimentation of the wastes takes place after a certain period , the supernatant is carefully removed by pipe to Secondary Treatment chamber, which is a double chamber attached by pipes only. The bottom sediments of the sewage from the primary treatment chamber are removed by a motor separately and dried under the sun in a sludge trolley, for drying. The effluent from the secondary treatment chambers are passed through the sand chamber followed by carbon (charcoal) chamber to the Ozonator, where it is processed and sent to Tertiary Treatment chamber through a pipe, from where, the water is released to creek and river. . After drying the sludge is converted to manure soil,which is stored in sacks behind the STP and given to farmers and gardeners. Chlorinated water is sprinkled by the workers in and around the area of STP.


    Fig:1 STP Unit in IIT Kamand Campus.



    Fig: 2 Process Flow Diagram of STP



    Fig: 3 Primary Treatment Chamber



    Fig:4 Secondary Treatment Chamber



    Fig: 5 Two Filter Chambers Left one is the Carbon (Charcoal filter)and the Right one is the sand filter Chamber



    Fig:6 RMBR (Rotating Media Bioreactor and Ozonator)



    Fig: 7 Trolley for drying of Sludge



    Fig: 8 Sack of stored manure after sun-drying



    Fig: 9 BOD Incubator and Hot Air Oven inside the room attached with STP.



    Fig: 10 Reagents for performing BOD tests


    Maintenance and Full-time Working at STP Unit(Day & Night): Ramesh and Chetram.

    Regular Monitoring : Er. Atul Sen performs the daily monitoring and BOD Tests on a regular basis.

    Research Project : Mr. Ravikant, a research scholar, under the guidance of Dr.Swami did some tests on daily basis from 17.06.15 to 27.06.15 and sent effluent water sample to IPH, Mandi for testing. He collected different water samples from different sources like tap water,river water,sipoa water, tank water, hand-pump water and sewage effluent for testing. Sewage Treatment Plant (STP) effluent water was sampled and sent to IPH,located in Mandi,for testing. IPH is the only place in entire Mandi town to have these tests done.

    Test Report : The Bacteriological Report revealed that there is presence of 40 colonies per 100 ml water sample, which should have been nil in the 100 ml sample.The Chemical Report revealed that total alkinity,BOD,COD,Nitrite, Ammonia, Nitrate, and Bicarbonate levels are higher in their acceptable limits.

    Facts that remained unrevealed :

    1. Tertiary Treatment is not done in the STP.
    2. There is a Hypo dosing Tank printed in the Process Flow Diagram sheet, but it has no real existence in the STP unit.

    Some immediate actions already taken : Since the STP is in warranty period, Col.Naik has already requested Mr.Sunil Kapoor on 20.08.2015 to have a dicussion with the CPWD / the contractor in an urgent basis to solve this problem as soon as possible.

    Analysis of the problem and the solution:

    1. A second or two more samples of effluent is required to be tested at the IPH,Mandi for cross-checking.
    2. Backwash water should not be the water after primary treatment.So, it is suggested to wash the two chambers with fresh water only.
    3. Er.Atul Sen is asked to monitor the working procedure of the STP along with optimum proportion of reagents and media being added.
    4. Some essential requirements for in-house setting - up of water quality test can be arranged,
      • ICPMS -for detecting presence of heavy metals from water even in ppb
      • Spectrophotometer
      • Chloride testing
      • Bacteriological Kit -for identification of different types of bacteria, since carrying effluent sample to the IPH is quite difficult and also different types of bacteria cannot be identified, only colony count is done.

    Some Future Prospects and Plan: Recycling of the STP effluent after tertiary treatment and re-using the water in toilet flushes. Installation of sludge digester and tank for biogas storage after production. This biogas can be used for several purposes in the campus. There can be small chambers comprising of porous sand in every outlet of washbasins and sinks, where, the dirts and food remnants are trapped and therefore seperated from the water. These wastes can be collected and used for composting or preparing fertilizers,the seperated water,then passes through the inlet of the STP for treatment. In this way, the sewage effluent can be made better for re-use.The dried waste from the STP can be used by the local farmers as manure.